OverviewEVENT // EY-TECHATHON-2025

TECHATHON-5

National Runner-Up•2025•48hr sprint

Built Polyphen during the event sprint.

Artifacts

DeckDemoPrototype repo

Event Metrics

Rank

#2

2nd among 150,000+ entries

Field

Healthcare

Polyphen

Duration

48hr sprint

2025

Key Insight

Combined BERT-driven symptom prediction with geospatial analytics so the app could move from intake to outbreak signal.

Case Study

Problem

Healthcare consultations lacked secure intake and useful outbreak insight.

Solution

Polyphen: encrypted Android consultations with BERT symptom prediction and geospatial tracking.